Able PAK provides cost savings at construction sites.
Over 43% reduction in diesel fuel consumption and additional benefits with Able PAK Battery Power Systems can be realized at construction sites.
Able PAK 066-066 or Able PAK 100-100 in their Hybrid running modes can deliver cost savings and Scope 1 emission reductions in user cases scenarios such as construction site tower cranes.
The Results:
$47,000 fuel saving per year
More than 43% reduction in diesel fuel consumption per year
Less than 3 year payback as a return on investment
58T CO2 emission savings per year