Able PAKs provide cost savings at construction sites.
Over 45% reduction in Diesel Generator run time and corresponding fuel savings with Able PAK Battery Power Systems can be realized at construction site offices.
Able PAK 066-066 or Able PAK 100-100 in their Microgrid running modes can deliver cost savings and Scope 1 emission reductions in user cases scenarios such as construction site office complex.
The Results:
$69,000 fuel saving per year
$24,000 nett savings in two years
Less than 2 year payback as a return on investment
85T CO2 emission savings per year